Major-program experience
Experience spanning rail, transit and civil infrastructure programs at local, regional and international levels.
AMARAT, LLC · CONCORDE LLC TEAM
Power systems, substations, rail and civil infrastructure—bringing experienced people and coordinated engineering to complex projects.
INTRODUCING THE CONCORDE LLC ENGINEERING TEAM
Civil, structural, electrical and project leadership in one coordinated team, with experience across substations, battery storage, transmission and major infrastructure.
NEW / INTEGRATED EPC LEADERSHIP
One senior point of coordination across scope, specialists, suppliers, contractors and the owner’s next decision.
Senior engineering and project advisory for public agencies, infrastructure owners and consulting teams.
Strategic direction and coordinated delivery for complex rail and transit programs.
For agencies & rail teams→Independent perspective, clear governance and senior-level owner representation.
For infrastructure owners→Connect civil works, utilities, stations and structures into one coordinated design.
For developers & design teams→Review risks and constructability. Prioritize decisions and establish a path forward.
For teams under delivery pressure→Strengthen technical proposals, multidisciplinary teaming and major-program positioning.
For engineering & consulting firms→Luay’s prior experience through the named employers. Online photos show the site or system, not proof of personal scope. Offline visuals are labeled design illustrations.
Experience spanning rail, transit and civil infrastructure programs at local, regional and international levels.
An understanding of owner priorities, agency coordination and community interfaces.
Connect engineering, planning, construction and program decisions.
Keep scope, risk, cost and schedule visible as the project moves forward.
SERVICES / EPC, RAIL & CIVIL DELIVERY
Engineering judgment, program direction and owner-side support—without losing sight of the next decision.
For agencies and project owners who need an experienced principal to connect technical decisions with delivery priorities.
Discuss an advisory engagement →Review the available design, scope, schedule, risks and decision backlog.
Identify civil, rail, structural and utility coordination issues that need action.
Define decisions, responsibilities and a practical sequence for moving forward.
Support owner meetings, consultant coordination, reviews and delivery oversight.
CAPABILITIES / SELECT THE SUPPORT YOU NEED
A focused engagement or senior support within your team. Start with the challenge—and shape the scope around what your project actually needs.
Grading, drainage, utilities, roadways and site coordination—developed into practical plans, estimates and approval packages.
For owners & developers ↗Bring stations, track, structures, roadways and utility interfaces into a coordinated view of the wider program.
For agencies & rail teams ↗Senior support for program governance, consultant coordination, stakeholder decisions and design-to-construction transitions.
For project & program owners ↗Review design interfaces, staging, quantities and practical delivery constraints before unresolved details reach the field.
For design & construction teams ↗Cost, schedule and risk review to clarify priorities, expose delivery gaps and establish a focused path forward.
For teams facing delivery pressure ↗Executive perspective on client strategy, technical proposals, multidisciplinary teaming and infrastructure-market development.
For engineering & consulting firms ↗Services shown are proposed engagement areas. Final scope, staffing, professional responsibility and jurisdictional requirements are agreed before work begins.
A PRACTICAL WAY TO BEGIN
What needs to move forward? Share the location, stage, scope and immediate challenge.
Agree the deliverables, responsibilities, schedule and the right level of technical involvement.
Establish clear priorities, communication and a practical framework for the work ahead.
Selected records connect Luay’s historical roles to the coordination clients need today. Experience shown below was gained with the named employers and agencies.
The October 6, 2013 organization chart names Luay Aljamal, P.E., as both Project Director and Principal-in-Charge. The team spans civil and roadway, drainage and utilities, track, signals and communications, structures, environmental, geotechnical, specifications and estimating.
The February 1, 2010 team chart identifies Luay as Project Manager, with separate systems integration, design leadership and construction staging functions. This is a concrete example of coordinating design disciplines and delivery interfaces.
Work-directive proposals identify Luay as GEC Program Manager for signal optimization, fiber-optic field-device connectivity and data-communication support. Other records address environmental work and stormwater planning at the South Terminal.
May 2013 meeting records list Luay among the mobilization participants. The records show the practical organization, staffing and deployment work behind a major program start-up.
The supplied emergency-generator upgrade proposal and staffing material include Luay in program management. This supports experience coordinating specialist power scope within an infrastructure assignment; it does not establish turbine-plant construction delivery.
An archived HNTB recognition article describes client praise for the Caltrain team and includes Luay in the pictured team. Recognition belongs to the team and is presented as historical evidence, rather than an individual award.
| Delivery need | Relevant experience | Proposed Amarat support |
|---|---|---|
| Multidiscipline interfaces | SAR branches and Fairfield team structures | Responsibility matrix, interface register and coordinated design reviews |
| Supplier and consultant scopes | Caltrain work directives and subconsultant coordination | Scope reconciliation, technical bid review and deliverable tracking |
| Program start-up | Riyadh Metro mobilization records | Staffing plan, governance, deployment milestones and reporting |
| Reliable infrastructure | Signals, communications and emergency-generator scopes | Specialist coordination and acceptance planning for critical interfaces |
| Controlled handover | GEC work-directive services framework | Monthly progress reviews, change tracking and closeout planning |
Organization charts document assigned roles; proposals document planned scope. These historical records do not imply that Amarat was the contracting firm or that every proposed task was completed.
PROJECTS / EXPERIENCE THAT CONNECTS
Explore 23 profiles across rail, bridges, public works, water, utilities and site development.
Prior experience through the employers named—not represented as Amarat prime contracts or current agency endorsements.
CREDENTIALS / QUALIFICATIONS YOU CAN EXPLORE
Original engineering registrations and seven distinct training certificates, presented in a readable document gallery.
04 / PROFESSIONAL CREDENTIALS
Civil engineering registrations in Washington and Oregon. Explore the original certificates, with registration numbers clearly identified.
STATE OF WASHINGTON
Civil Engineering
Luay Khamis Al-Jamal
STATE OF OREGON
Civil Engineering
Luay Khamis Al-Jamal
Certificates document original registration. Current active status and renewal have not been independently verified for this preview. These are individual credentials, not firm registrations or nationwide licensure.
05 / TRAINING & PROFESSIONAL DEVELOPMENT
Seven distinct course certificates spanning transit planning, project delivery, professional services and technical design. Open each card to view the supplied record.
Historical training, precisely stated. PDH = professional development hours; CEU = continuing education unit. Dates and credits follow the certificates. Duplicate scans appear once. These records are not a claim of current license-renewal credit, active membership or present-day training compliance.
View the supplied professional registration and renewal records. Confirm current status with the applicable licensing board before relying on a historical document.
Professional Engineer certificate (2026) ↗ Registration renewal record ↗
Luay K. Aljamal, P.E., brings 40+ years across public agencies, global consultancies and owner-side programs. His experience connects rail and transit, bridges, roads, utilities, water resources, institutional facilities and civil/site development in the United States and Saudi Arabia.
The supplied resume describes recovery of challenged rail delivery through staffing, governance, project controls, design review and client alignment.
Former COO and consulting-practice leader with operations, workforce planning, strategic pursuits and multidisciplinary delivery responsibilities.
Experience from feasibility and alternatives through design-build coordination, permits, bid documents, construction support and acceptance planning.
Engagements may be structured as independent consulting, C2C, interim leadership, monthly retainer or defined-scope assignments.

ABOUT / MEET YOUR PRINCIPAL
Engineering judgment that connects design with delivery.
Luay’s experience spans public-agency engineering, consulting-practice leadership and international rail-program direction. His project history brings together civil design, owner representation, multidisciplinary coordination and business development.
That combination shapes the proposed AMARAT approach: work directly with the principal, define the real problem, and bring the right technical and delivery perspective to the table.
Original registration certificates are available below. View licenses ↗
CAREER EXPERIENCE THROUGH ROLES AT
Begin with the real problem, define the scope and make the responsibilities clear.
Career experience brings together public-agency engineering, consulting-practice leadership and international program direction.
Bring civil design, utilities, rail, structures, stakeholders and construction considerations into the same conversation.
Agree deliverables, professional responsibility, timing and any specialist support before the engagement begins.
Supplied 65% plan-set material and marked-up sheets show architectural, electrical and communications interfaces. The source material is historical and includes “Not for Construction” sheets. Markups are review records, not issued construction approvals.






WD 4733, January 27, 2009: proposal for signal optimization and second ATCS channel projects, naming Luay Al-Jamal as GEC Program Manager. Scope includes safety, quality records, submittals, RFIs, shop/as-built drawings, changes, claims and project closeout. A proposal documents intended scope; it is not evidence by itself that every listed task was completed.
ARCHIVE / RECOGNITION, STUDIES & PRESS
Explore the recognition, crossing studies and historical coverage behind the professional story.
Historical records are shown for professional context; rights remain with their respective owners.
07 / START A CONVERSATION
A site that needs a path forward.
A rail program with difficult interfaces.
A project team that needs senior perspective.
Tell Luay where you are—and what needs to happen next.
luay.aljamal@Amaratllc.com ↗+1 408 612 2808Portland, Oregon · U.S. & Saudi Arabia project experienceA few details make the first conversation more useful.
Project and program records add concrete context to the EPC approach: multidisciplinary rail design, signals and communications, environmental interfaces, mobilization and emergency-power coordination.
Review documented experience →EPC / ENGINEERING · PROCUREMENT · CONSTRUCTION
Executive leadership and owner representation across engineering, procurement and construction—from a clear project basis to commissioning and handover.
Coordinate civil, structural, electrical, mechanical, controls and utility teams. Connect design criteria, studies, drawings, specifications and constructability reviews.
Develop common bid requirements, evaluate technical scope and exclusions, coordinate supplier interfaces and track long-lead equipment, guarantees and delivery milestones.
Support staging, contractor performance, submittals, RFIs, quality, change control, acceptance planning and closeout with a visible owner decision trail.
Independent executive oversight of the owner’s EPC team, technical advisers and contractors. Define responsibilities and hold decisions, scope, cost and schedule together.
Program direction, multidisciplinary coordination, delivery recovery and project controls within a defined owner or delivery-team assignment.
Design and constructability review, interface registers, procurement package checks and commissioning readiness with qualified discipline specialists.
Engagement scope: contractor licensing, specialist engineering, staffing and construction execution responsibilities will be established for each engagement. Amarat is not presented here as the turnkey constructor of prior employer projects.
Agree the load or operating need, site constraints, performance requirements, risk allocation and delivery model.
Align studies, design packages, estimates, equipment specifications and the integrated schedule.
Control vendor interfaces, site readiness, construction sequencing, changes and quality records.
Establish acceptance criteria, coordinate witnessed tests, resolve punch items and deliver records, training and operating documentation.
HNTB Senior Project Manager: station, bridge, pedestrian underpass, track, traffic and utility interfaces. Supplied architectural and electrical sheets illustrate multidisciplinary coordination.
HNTB program leadership and construction-management scope coordination. Work Directive 4733 names Luay as GEC Program Manager and covers signals, crossings and ATCS channels.
Track and station design, utility relocation, construction support and intergovernmental coordination; the resume reports 20% construction-cost savings through value engineering.
Winzler & Kelly: hazardous-material facility civil design, school-campus development, utilities, drainage, permitting and construction support.
POWER + DIGITAL INFRASTRUCTURE
CONCORDE LLC TEAM / ENGINEERING CAPABILITIES
Electrical, civil, structural and architectural disciplines coordinated from concept development through construction-ready engineering.
Concept development, AIS and GIS arrangements, equipment layouts, elevations, bus and conductor design, electrical clearances, lightning protection and station service.
Protection philosophy, relay settings, AC/DC schematics, panel layouts, communications, IEC 61850 automation, point lists, fiber interfaces and defined OT-security design.
Load flow and contingency analysis, short circuit and equipment duty, grounding and step/touch, protection coordination, arc flash, reactive power, insulation coordination and harmonic screening.
Site layouts, grading and earthwork, access roads, utilities, drainage, hydrology and hydraulics, stormwater, erosion control, fencing and permit documentation.
Transformer and equipment foundations, oil containment, steel supports, dead-end structures, retaining walls, firewalls, cable trenches, duct banks and control-enclosure interfaces.
Overhead and underground line interfaces, line routing and PLS-CADD modeling, poles and towers, foundations, OPGW and ADSS fiber, rebuilds and reconductoring.
Control-enclosure and site-building architecture, wet utilities, building-service coordination, HVAC interfaces, fire alarm and protection, lighting, small power and ELV systems.
Interconnection substations, battery yards, switchgear enclosures, auxiliary power, protection coordination and integration of civil, structural, electrical and campus interfaces.
Multidiscipline coordination, design reviews, scope and schedule control, cost management, QA/QC, procurement technical review, construction RFIs and record drawings.
Develop the design basis
Coordinate the disciplines
Resolve details and reviews
Issue coordinated packages
Typical engineering outputs include drawings, calculations, specifications, bills of materials and quantities, vendor reviews, BIM coordination and as-built records. Services, field support and responsible licensed professionals are assigned for each engagement.
Historical SamTrans North Base generator-upgrade records include Luay in program management. That experience informs owner-side coordination of specialist electrical work. The gas-turbine campus material below remains a separate development concept.
POWER & DATA CENTERS / DEVELOPMENT CONCEPT
Feasibility, site screening, procurement coordination and owner-side delivery planning for gas-turbine power and data-center infrastructure.

CAMPUS DEVELOPMENT CONCEPT
At an assumed design PUE of 1.30, the IT load becomes 130 MW facility load. The reports apply 10% screening headroom, giving a 143 MW target with one unit unavailable.
Five units at an assumed 45 MW dependable net output leave 180 MW after one outage. Four units at 50 MW leave 150 MW. Exact selection depends on guaranteed site output and reliability studies.
SEPARATE FEASIBILITY CASE
The other feasibility report evaluates five units at 25.6 MW site-net, with a 2% downstream-loss allowance, independent emergency supply and UPS.
This is a different load and resilience basis. Its $600 million model and 40–60 acre power-site reservation are not combined with the 130 MW campus concept.
The campus concept uses a 20–30 acre preliminary power-site reservation, excluding data-center buildings and cooling yards. All capacity, land, cost and schedule inputs require site studies and supplier proposals.
Buildable land, access, gas pressure and firm transportation, diverse fiber paths, cooling and water needs, title, drainage and environmental constraints.
Civil layout, foundations, fuel equipment, switchgear, transformers, A/B distribution, controls, UPS, backup supply, fire systems and maintenance access.
Compare U.S., China, Sweden/Europe and Japan sourcing routes on site-net performance, 60 Hz configuration, compliance, service, spares, origin, shipping and delivery risk.
Study turbine trips, bus faults, fuel loss, black start and cooling restart. Installed N+1 megawatts alone do not demonstrate uninterrupted power or a certified uptime tier.
Establish the customer and operating requirement; screen properties; secure conditional site control; appoint qualified power and permitting specialists; reconcile FEED, OEM and EPC proposals; then align fuel, tenant, finance and delivery agreements.
Based on the supplied Gas Turbine Data Center Feasibility Report, Data Center Gas Power Development Report, Power Concept and Site Requirements brief, Country Comparison workbook and labeled rendering. The source models differ in load definition, unit size, land scope and resilience package. They are development studies, not completed Amarat power projects, vendor quotations or guaranteed commercial offers.
AMARAT, LLC / CONCORDE LLC
Meet the Concorde LLC engineering team: 18 professionals spanning project direction, civil and structural design, foundations, electrical engineering, protection and controls, and transmission.
Explore full professional profiles, education, registrations, specialist tools and project experience.
Project direction and civil engineering coordination
Project management and civil / structural engineering
Electrical project management and delivery coordination
Qualifications reflect the November 1, 2026 team submission and include work performed with prior employers. Project assignments and current professional registrations are confirmed for each engagement.
18 team members
Project Director / Civil Engineering Coordination
Civil engineering and multidisciplinary program leader with over 40 years' experience in site development, utility coordination, public-agency approvals, design quality and cost control.
Read full resume : Luay K. Aljamal, PEProject Manager; Civil and Structural Engineering Manager
Professional Engineer experienced in structural engineering, mentoring technical teams, and complex transmission and substation projects.
Read full resume : Kent Lam, PEFoundation Engineering Lead
Civil and structural engineering subject-matter expert with 28 years of direct employment with CenterPoint/HPL and more than 45 years of combined industry experience.
Read full resume : Mark Johnson, PEPrincipal Structural Engineer and Technical Advisor
Structural engineering subject-matter expert with more than 50 years of industry experience, including 53 years with CenterPoint Energy and its predecessors.
Read full resume : George Watson, PEStructural Design Lead
Civil/structural engineer and project manager with nearly 20 years of progressive energy-industry experience.
Read full resume : Jonathan St. Clair, PEDeputy Project Manager, Civil
Transmission line and civil engineering subject-matter expert with more than 20 years of utility experience as an executive, project manager and engineer.
Read full resume : James Hannigan, PE, PMPIndependent Civil and Structural Quality Review
Structural engineer with more than 40 years of civil, structural and transmission evaluation and design experience.
Read full resume : James Seternus, PECivil and Site Design Lead
Registered Professional Engineer with a BS from Cal Poly, San Luis Obispo, and more than 20 years of industry experience.
Read full resume : Ron Reilly, PEProtection and Control Design Lead
Electrical/protection engineer with over 15 years in system protection, design and analysis.
Read full resume : Brandon M. Lewey, PESubstation Project Engineer and Commissioning Lead
Project Engineer with over 15 years of experience overseeing commissioning projects in the utility sector.
Read full resume : Eric Kluempers, PEProject Manager; Electrical Project Manager
Project Manager with 20 years in utility, construction and aerospace work.
Read full resume : Jason Rogers, PMPStartup Testing and Turnover Support
Project Engineer and Commissioning Leader with 30+ years delivering utility power capital projects.
Read full resume : Thomas PierieDeputy Project Manager and Cost and Schedule Controls
PMP-certified project and client-success leader with experience in cybersecurity consulting, utility transmission/substation project management, and power-plant commissioning and testing.
Read full resume : Anna (Zor) Bellavia, PMPElectrical and Physical Design Lead
Licensed Professional Engineer with an extensive background in design engineering and leading design teams in substation engineering.
Read full resume : Nandu Balachandran, PERelay Settings and System Studies Lead
Power system protection and control application and relay settings engineer with more than 18 years of protection, control and relay settings experience, more than 2 years of distribution design and 2 years of research.
Read full resume : Venkata K. Pendurthi, PESenior Protection and Control Design Engineer
Power-system transmission and distribution engineer with more than 12 years of experience, including relay design, engineering management, FACTS and high-voltage substations.
Read full resume : Sridhar Takkallapalli, PE, PMPProtection and Control Quality Reviewer
More than 22 years of experience in the power industry, mostly in protection and control design.
Read full resume : Lowery BennettTransmission Line Interface Lead
Licensed Professional Engineer specializing in civil engineering, with more than 17 years as a consultant in power delivery.
Read full resume : Matt Hebner, PENo team members match this search. Try another name, skill or discipline.
CONCORDE LLC TEAM / PROJECT EXPERIENCE
Substations, data centers, battery storage, transmission corridors and resilient civil infrastructure. Explore project scopes and the people behind the engineering.
Experience of team members in current and prior roles, including work with prior employers. Project status is as reported November 1, 2026.
Substations & BESS / Northern California
Ongoing team project experience · Confidential client
A new data center conversion required an upgrade to the existing 138 kV substation, a new 138 kV substation and switchyard, a 138 kV underground transmission line between them, a BESS yard and a Bloom Energy yard.
Existing MEP tunnels and other building structural components were analyzed for retrofit to bring the low-voltage feed to the data hall. LiDAR scanning of the existing structures and tunnels produced a building information model to support the structural analysis.
The project is ongoing, with a target construction completion date of late 2028.
Civil and site engineering; structural analysis; flood mitigation; BIM and data acquisition; permit support and stakeholder coordination.
Civil & resilience / Houston, Texas
Prior team project experience · CenterPoint Energy
The substation underwent civil and structural enhancements for resilience and flood mitigation. Critical 345 kV infrastructure required site elevation and regrading to address regional flood exposure.
The site was raised approximately eight feet using engineered fill and stabilized embankments. Concrete-lined perimeter slopes provided erosion protection and long-term slope stability.
A dedicated detention pond with concrete-lined slopes managed runoff from the expanded substation footprint. The grading and drainage design addressed projected flood levels and downstream impacts.
Site development and civil engineering; flood mitigation; drainage and detention; permitting and stakeholder coordination.
Civil & resilience / Houston area, Texas
Prior team project experience · CenterPoint Energy
This 138 kV substation provided a more reliable and direct power source for Seabrook, which previously relied on a single feed routed across the ship channel.
The site required extensive coordination with neighboring residents. Light, noise and safety assessments informed the arrangement. Increased separation between the substation and the detention pond provided additional buffering, and a twelve-foot concrete wall addressed sound and light impacts.
The detention pond incorporated concrete-lined slopes for stability and maintenance. An aerator addressed stagnant water and mosquito concerns.
Site development and civil engineering; stormwater management; community engagement; permitting and stakeholder coordination.
Structural & security / Houston, Texas
Prior team project experience · CenterPoint Energy
A high-security perimeter upgrade addressed repeated cut-ins, copper-theft attempts and vehicle incursions at an urban substation.
The design incorporated an eight-foot anti-cut, anti-climb louvered mesh fence and an M50-P1 crash-rated barrier system at key approaches, rated to resist impact from a 15,000-pound vehicle traveling at 50 mph.
Fence and barrier foundations were engineered for sustained wind loads up to 150 mph. Reinforced posts, deeper embedment and upgraded hardware supported perimeter resilience.
Security fence design; vehicle-barrier integration; structural foundations; survey coordination and safety mitigation.
Transmission / Houston, Texas
Prior team project experience · CenterPoint Energy
A three-mile corridor carrying two 345 kV and three 138 kV circuits required increased electrical and structural capacity. The design addressed a congested right-of-way, populated areas and layered freeway ramps.
Engineering included overhead line modeling, custom steel monopoles, drilled-pier foundations, temporary bypass lines, outage sequencing, Texas Department of Transportation (TxDOT) and Federal Aviation Administration (FAA) coordination, and lighting and stormwater documentation.
Double-circuit monopoles ranged from 150 to 210 feet high. Structures and spans exceeding 200 feet required lighting and markers. Drilled piers ranged from eight to fourteen feet in diameter and forty to sixty-five feet deep.
PLS-CADD modeling; routing; structural and foundation design; agency coordination; engineering work-order packages.
Foundations / Houston, Texas
Prior team project experience · CenterPoint Energy
Two 318-foot towers replaced a tornado-damaged Houston Ship Channel crossing carrying three 138 kV circuits. The north tower used a large pier; extremely soft soils at the south tower required a different foundation solution.
The upper sixty feet of soil presented negative skin-friction concerns under tower-leg loads of approximately 1,000 kips. Steel pipe piles with concrete caps were selected.
Each tower leg was supported by eight 150-foot piles fabricated from four welded sections of 34-inch pipe. Concrete caps measured 22.5 feet square and eight feet thick.
Foundation and structural engineering; civil design; right-of-way and third-party agency coordination.
Transmission / Houston, Texas
Prior team project experience · CenterPoint Energy
Engineering covered the rebuild of an existing three-mile double-circuit 138 kV steel lattice transmission line with new towers and drilled-pier foundations. The final arrangement accommodated two 72-fiber all-dielectric self-supporting (ADSS) cables and three personal communications service (PCS) sites.
Underground utilities and limited right-of-way required careful structure placement, outage sequencing and a full temporary bypass. The bypass allowed replacement of structures in place at constrained turning locations.
At angle locations, steel lattice towers were used instead of the monopoles first considered, because of fabrication lead times. The photographs show the temporary bypass.
PLS-CADD modeling; overhead line design; structural and foundation engineering; survey, geotechnical, subsurface utility engineering (SUE) and stormwater coordination.
NAMED EXPERIENCE / ROLES & RESPONSIBILITIES
Each reference identifies the team member, engineering role and reported project status. These records are team experience; they do not imply every project was an Amarat or Concorde prime contract.
| Project / client | Voltage | Engineering scope | Team member / role | Status |
|---|---|---|---|---|
| Albion, Larrabee and Raven substations; Central Maine Power | 345/138/34.5 kV | Complete structural engineering and analysis for greenfield substations: foundations, steel supports, rigid bus, lighting masts and shielding, executed through 30%, 60%, 90%, IFB, IFC and construction support | Kent Lam, PE, lead engineer; Jonathan St. Clair, PE, senior engineer and EOR | Completed and energized |
| Southern Texas Project 345 kV Substation; CenterPoint Energy | 345 kV | All foundations and below-grade structures for a greenfield substation, with construction support and as-built services | Mark Johnson, PE, principal/SME | Completed |
| Flewellen Substation; CenterPoint Energy | 345/138/12 kV | Engineering, design and analysis of above-grade structures for a new substation, with construction support and as-built services | George Watson, PE, principal/SME | Completed |
| Marcus Hook; PECO | 230 kV | Structural analysis for system upgrades at four substations: breaker replacements, bus bracing, steel supports, work platforms and foundations | James Seternus, PE, principal and lead engineer | Completed |
| Circle Lake Substation and Switchyard; CenterPoint Energy | 138 kV | Complete site/civil design of a greenfield substation: pad, drainage and detention, hydraulic modeling, SW3P and permitting | Kent Lam, PE, EOR; Ron Reilly, PE, principal | In progress, at 60% |
| Data center substation; confidential client, Northern California | 138/34.5 kV | Complete civil and structural design of a greenfield substation, underground transmission, switchyard, BESS yard and Bloom Energy yard | Kent Lam, PE, senior manager/principal; Ron Reilly, PE, principal and EOR | In progress, approaching 60% |
| Transformer foundation design standards; CenterPoint Energy | All voltages | Company-wide transformer foundation standards, with a 500-page report and design-automation program, still in use at CenterPoint Energy | Mark Johnson, PE, principal/SME | Completed |
| Transmission and distribution substation construction packages; SEL-ES (prior employer) | Transmission | Control-house and panel layouts, panel BOM, metering and relaying one-lines, cable schedules, logic diagrams, AC/DC schematics and wiring diagrams; design reviews | Brandon M. Lewey, PE, protection engineer and system protection supervisor | 2011–2017 |
| Transmission protection and control; Ameren Transmission (prior employer) | Transmission | Pushbutton design standards; line, transformer and bus relay settings; protection coordination; fault analysis | Brandon M. Lewey, PE, P&C engineer | 2017–2025 |
| Zachary Substation | 345/161 kV | 345 kV ring bus expanded to five breaker-and-a-half bays; 161 kV yard to four bays; relaying for temporary configurations | Eric Kluempers, PE, project manager/engineer, commissioning | Completed |
| Roxford Substation | 345 kV | Added one 345 kV breaker for a six-breaker ring bus; breaker and line relaying replaced over four outage seasons | Eric Kluempers, PE, project manager/engineer, commissioning | Completed |
| Rezzy Substation; Ameren (ATX), $15 million | 138 kV | Five-position initial, six-position ultimate ring bus; property acquisition, line reroutes, reconductoring and rebuilds | Anna (Zor) Bellavia, PMP, project manager | Completed |
| Four Seasons Substation; Ameren (AMO), $12 million | 34.5 kV | Two 34.5/12 kV transformers, two high-side and two low-side switchgear, six new feeders, underground and overhead circuits | Anna (Zor) Bellavia, PMP, project manager | Completed |
| Stallings Breaker-and-a-Half; Turner Substation | 138 kV | Seven-position initial breaker-and-a-half arrangement; new wind-farm position on a ring bus, with interconnection and collector-substation coordination | Jason Rogers, PMP, project manager | Completed |
TECHNICAL EXPERIENCE / PROJECT LIBRARY
41 project and study entries
| Project / program | Experience & scope |
|---|---|
| HV substation for a data center | Protection and control designEntire engineering for the HV substation feeding a data center: civil, electrical, relay, settings, SCADA and studies. |
| 230 kV substation, single point of failure | Protection and control designSecond primary protection schemes on all lines leaving the substation; primary 1 and 2 bus differential panels; CCVTs replaced for X and Y potential. |
| 230/115 kV autotransformer protection | Protection and control designTransformer differential panel and 115 kV breaker replaced. |
| New substation and line | Protection and control designRadial transmission line designed for a higher voltage than its initial energized voltage. New substation with a dual-rated 40 MVA LTC transformer (13.8 kV low side), high-side bus and Series 2000 circuit switcher; 13.8 kV main and feeder breakers with low-side bus and bays; new control house. Double-circuit distribution line with 795 Al conductor and 13.8 kV underbuilt. |
| 500 kV switching station | Protection and control designLine panel replaced (SEL-411L); three-terminal line differential scheme with a remote breaker. |
| 115 kV transformer bay upgrade | Protection and control design115 kV fault-interrupting switch, slip-over and neutral CTs, low-voltage PT junction box, sudden pressure junction box, station service transformer with 200 A outdoor automatic transfer switch, VCB main breaker, new bus differential panel, and RTU rack with SEL-3355. |
| 69/13.2 kV substation | Protection and control designTransformer T1 differential panel replaced (SEL-387E and SEL-587) and high-side circuit switcher installed. |
| 69 kV substation | Protection and control designLine panel replaced (SEL-411L), RTU upgraded with SEL-RTAC, new CCVTs. |
| Relay settings quality checks | Relay settingsQuality checking of relay settings for the substation, in several phases, serving AWS facilities. |
| 230 kV line reconductoring (three projects) | Relay settingsSettings for the reconductored main line and revisions at remote lines; QA of settings with new SEL-411L line relays and SEL-451 breaker controls. |
| CAPE modeling | Relay settingsModeling of a large capital program with new 230/138 kV stations, transmission lines, and distribution and autotransformers. |
| 500 kV relay impact analysis | Relay settingsNew 500 kV substation with multiple new lines: scope and impact on surrounding protection functions. |
| 138/69 kV new station | Relay settingsDevelopment and QA of settings for the entire project; offline construction support during relay testing. |
| 115 kV and 161 kV new cut-in stations | Relay settingsSettings and quality review for new line panels and remote revisions; NERC PRC-023 and PRC-027 where stated. |
| 230 kV solar interconnection | Relay settingsSEL settings on all panels and remotes; NERC PRC-023, PRC-027 and PRC-025. |
| 500 kV station | Relay settingsVoltage transfer panel added and bus differential panels replaced; NERC requirements including CIP. |
| Relay impact analysis | Relay settingsShort-circuit, CT saturation, relay compatibility and breaker rating studies, NERC requirements, P&C philosophy and standards sufficiency, to develop settings scope. |
| Distribution settings and relay upgrades | Relay settingsFeeder under-frequency tripping settings in Texas, with distribution automation; complete distribution relay upgrade (SEL-487E, SEL-387E, SEL-587). |
| Line panel replacement; RTU/SCADA | Relay settingsNew panels with SEL-421 and SEL-311C; RTU configuration for new stations, integrated with SEL RTAC. |
| 38 kV Barceloneta BESS (current) | Physical engineering, below 69 kVGreenfield 100 MWh battery yard and interconnection substation: GIS switchgear enclosure with incomer, four BESS circuits and auxiliary power; 38/13.2 kV transformer and high-side gas breaker; line tap with Viper recloser sectionalizing scheme. |
| 38 kV Aguadilla BESS (current) | Physical engineering, below 69 kV4 x 25 MW battery yard and interconnection substation: metal-clad switchgear enclosure, 38/13.2 kV transformer and high-side gas breaker, layout avoiding sinkholes, road and gate access, line tap. |
| 34.5/12 kV station rebuild | Physical engineering, below 69 kVRebuild of a 34.5/4 kV substation: switchgear, 15 MVA transformers and system studies (load flow, lightning, grounding, arc flash), with P&C and physical design. |
| 34.5/4 kV GIS switchgear | Physical engineering, below 69 kVComplete rebuild of the 34.5 kV bus: GIS, new protection and control panels, control house and auxiliary equipment. |
| Distribution upgrades | Physical engineering, below 69 kV34.5 kV switchgear relays; voltage optimization regulators for 30+ substations; RTU and SCADA upgrades; 34.5 kV vacuum breakers at five substations; 12 kV Viper reclosers; animal fences. |
| Battery replacement | Physical engineering, below 69 kVDC studies, sizing and installation of the station battery and charger. |
| Station drawing reconciliation | Physical engineering, below 69 kVAs-built drafting from visits to 30+ substations, to true up drawings with the station. |
| 500 kV autotransformer replacement | Physical engineering, 500–69 kVNew 500 kV autotransformer and differential panel: SEL-487E and SEL-387E primary protection, dual SEL-411L secondary protection. |
| 230 kV single point of failure | Physical engineering, 500–69 kVStation redesigned for separate CTs, X and Y windings and DC trip sources for primary and secondary relays; CCVTs with X, Y and Z windings. |
| 161 kV station rebuild | Physical engineering, 500–69 kVNew control enclosure and fence expansion; two live-tank and six power circuit breakers; ten manual and four motor-operated disconnect switches; SSVTs, CCVTs, PTs and arresters; bus and jumpers upgraded to at least 3000 A; transmission and distribution protection panels. |
| 138 kV greenfield ring bus | Physical engineering, 500–69 kVFour-position initial, six-position ultimate, 3000 A ring bus with new control enclosure, GOAB and MOAB switches, SSVTs, CCVTs and PTs; new ground grid, lightning and lighting studies. |
| 138 kV aging infrastructure | Physical engineering, 500–69 kVOil bus-tie breaker replaced with SF6; new line breaker, lightning masts with foundations and disconnect switches; bus PTs, CCVT and line drops upgraded; four new control house panels. |
| 115 kV relay replacement | Physical engineering, 500–69 kVNew line-breaker panel (SEL-411L, SEL-311C, SEL-351S, SATEC PM172), line current differential scheme, bus differential (SEL-587Z, SEL-487B). |
| 69/13.2 kV transformer replacement | Physical engineering, 500–69 kVNew power transformer and high-side circuit switcher; new differential panel (SEL-387E, SEL-587) and control cabling. |
| Programs | Physical engineering, 500–69 kVOil breakers replaced with SF6 at 10+ substations, 115–500 kV; RFL GARD 8000 direct transfer trip across 20+ stations; site walkdowns and scoping at 10+ substations. |
| Yabucoa and CIRO One (current) | Line engineering38 kV and 230/115 kV solar interconnections with steel poles in a hurricane-prone area. |
| Fiber and distribution rebuilds | Line engineeringIntelligrid Access High and Medium; Euclid-76, Warson-71, Point Prairie, Arnold-76, ARN-74, Farmington–Knoblick; Arnold-Statcom, Pasadena and Roxford-80 reroutes; CDIS pole replacements; IFC book reviews. |
| 138 kV area connections | Line engineeringHERE WFRE, Kline and Puro, with wood and custom steel pole structures. |
| Standards and studies | Line engineeringMaterial, wire estimating and QA workbook and 10 training modules for utility line staff; evaluation of 7,000+ NESC violations in Illinois; Vaile overhead-to-underground conversion; redundant fiber to a utility operating center. |
| ASPEN OneLiner and CAPE | System studiesShort circuit and coordination, distance relay coordination, breaker capability. |
| PSS/E | System studiesLoad flow, contingency, dynamic studies (LVRT, HVRT, frequency ride-through, grid compliance), short circuit, reactive power. |
| ETAP and SKM | System studiesLoad flow, short circuit, relay coordination, DC and AC arc flash. |
No matching projects. Try another search or engineering area.