Professional Profile
Licensed Professional Engineer specializing in civil engineering, with more than 17 years as a consultant in power delivery. Has established and managed engineering teams and delivered transmission line designs up to 500 kV, with utilities including Xcel Energy (PSCo and NSP), Ameren, AEP and Central Maine Power, and smaller municipal partners.
TRANSMISSION OVERHEAD LINE DESIGN (500 – 138 kV)
- LUMA, 230/115 kV CIRO One gen-tie, 2024. Solar interconnection connecting two 115 kV lines to a new substation, with structures added to the nearby 230 kV line for blowout. Guyed steel poles and two 1192 ACSR conductors with hurricane wind designs.
- LUMA, 115 kV Yabucoa gen-tie, 2024. Solar interconnection connecting a new 115 kV BESS substation to an existing substation (new arbor). Guyed steel poles.
- Central Maine Power, 69 kV Viper switch installs, 2023. Switch locations added to modernize 32 transmission circuits; construction and record packages.
- Ameren, Puro T-line re-route, 2021 – 2023. One 138 kV line rerouted into a new client-owned substation for a wind farm, with sequence drawings. Project Engineer, sealing engineer and Engineer of Record: checked the PLS- CADD model, prepared construction drawings and provided construction support.
- Ameren, Herrin East 138 kV (EOR), 2020 – 2023. Two 138 kV lines rerouted with sequence drawings for the expansion of a 4-bay substation to a 6-bay ring bus.
- Ameren, South Belleville Tilton 138 kV (EOR), 2016 – 2017. About 14 miles of wood pole line: NESC clearance violations, new OPGW, structure replacement and steel pole crossings.
- Ameren, Pana – Austin 345 kV (EOR), 2015 – 2017. About 32 miles of self-supporting steel poles.
- Ameren, Meredosia – Ipava 345 kV (EOR), 2015 – 2017. About 38 miles of self-supporting steel poles, with a river crossing span of about 3,200 ft.
- Xcel, North Rochester to Mississippi River 345 kV (lead foundation engineer), 2014. Foundation design for about 43 miles of double-circuit monopole foundations, with construction support on mix design, rebar and anchor cages, and alternative designs.
DISTRIBUTION OVERHEAD AND UNDERGROUND DESIGN (69 – 4 kV)
- Kirkwood, 4 to 12 kV conversion program, 2022 – 2024. New replacement substation with combined overhead and underground feeds; coordination with the local utility on a joint-use substation.
- Ameren, Intelligrid Access High (EOR and management), 2017 – 2020. 32 projects, 9 engineered and the rest managed, adding fiber to 69 – 4 kV lines.
- Ameren, Statcom (EOR), 2022 – 2023. Two 69 kV line reroutes for new T-lines and substation expansion, in a congested network of circuits.
- Ameren, Point Prairie (EOR), 2022 – 2023. New 69 kV circuit on an existing 12 kV line, with 69 kV underground design at the substation and select crossings.
- Ameren, ESTR-73 (EOR), 2020 – 2023; Arnold-76 (EOR); Mason-71 (EOR), 2020 – 2021. 69 kV rebuilds of about 7, 4.5 and 1.5 miles, with OPGW, reconductoring, and composite and wood poles where stated.
- Ameren, Vaile overhead-to-underground conversion (EOR), 2022 – 2023. 12 kV and 4 kV circuits removed and buried for traffic safety.
- Ameren, CDIS pole replacement program, 2020 – 2023. More than 500 single-pole replacements per year.