Professional Profile

Power system protection and control application and relay settings engineer with more than 18 years of protection, control and relay settings experience, more than 2 years of distribution design and 2 years of research. Experience includes misoperation analysis and remedial actions; NERC regulatory compliance for protection and control (CIP, PRC-025, PRC-023, PRC-001/PRC-027, PRC-026, PRC-005); managing engineering teams, budgets, bidding and delivery; and training and mentoring young engineers in power system protection.

Selected Experience

Principal Engineer

Engineering practice | Brandon, MS | Since September 2021

Consultancy on protection and control applications; development and quality checking of relay settings for transmission, distribution and generation interconnections.

Principal Engineer

Contractor for Entergy and Southern Company | March 2016 to December 2021

  • Expert opinion on the technical aspects of power system protection and control schemes.
  • New and improved relay settings standards; settings for high-profile non-standard jobs.
  • Mentorship and leadership of less experienced and new-hire engineers; responsible for the group’s budget, efficiency and quality.

Senior Protection and Control Engineer; Electrical Engineer II, III

CompuSharp Inc., Jackson, MS, January 2012 to February 2016 | IK Power System Solutions Inc., Jackson, MS, May 2010 to January 2012

  • Short-circuit and coordination studies and relay settings for transmission lines, transformers, capacitor banks, bus protection and breakers at HV and EHV levels, on Schweitzer, GE, Westinghouse, ERL and electromechanical relays.
  • Project execution plans, facility study documents and labor estimates for capital and grid projects; scope documents and relay impact studies.
  • Test plans and support for field engineers during relay testing; settings support for planned and unplanned outages.
  • Settings and documents in compliance with NERC and SERC requirements (PRC-025, PRC-023, PRC-001, PRC-005, FAC-009).
  • ASPEN OneLiner and CAPE model creation and review; arc flash studies with PPE, labels and safety procedures; clearing time analysis for system stability.

Smart Grid Engineer

CompuSharp Inc., Jackson, MS | October 2009 to April 2010

Developed SCADA systems in Fortran (EMS SCADA) and CIM models in XML/UML.

Graduate Research Assistant

Mississippi State University | February 2008 to November 2009

Developed a fuzzy inference algorithm to mitigate uncertainty in meter data, combined with a genetic-algorithm reconfiguration system in MATLAB.

Electrical Design Engineer (Buildings and Factories)

Larsen & Toubro Limited, Chennai, India | July 2006 to November 2007

Complete electrical designs for commercial, industrial and IT office buildings: load estimation, transformer and backup-generator sizing, cable schedules, lighting, power flow and short-circuit calculations, and arc flash studies. Supervised the CAD drafting team and prepared scope, design basis, bills of materials and technical specifications.